The Short Answer Is Yes, in Most Cases
If your driveway connects to a council-managed road in Geelong, you almost certainly need a vehicle crossing permit before any work starts. This applies whether you are building a new crossover or replacing an existing one.
Skipping this step can result in council ordering the work to be removed and redone at your expense. Getting the permit sorted upfront is straightforward, and it protects you from that outcome.
What a Driveway Crossover Actually Is

A driveway crossover is the section of your driveway that crosses the nature strip and kerb to connect your property to the public road. It is not just your private driveway slab. The crossover sits on council land, which is why council approval is required.
If you are planning a concrete driveway crossover in Geelong, that section between your property boundary and the road is the part that triggers the permit requirement. The driveway on your own land is a separate matter.
When a Vehicle Crossing Permit Is Required
A vehicle crossing permit is required when you are constructing a new crossover, widening an existing one, or making significant changes to the kerb or nature strip. Routine resurfacing of your private driveway does not typically trigger the requirement, but any work that touches the nature strip or kerb does.
The permit is issued by the City of Greater Geelong. You apply through council, and the process includes an inspection once the work is complete to confirm it meets their standards.
What Council Looks at During the Inspection
After the crossover is built, council will inspect it before the permit is formally closed out. They check that the crossover sits at the correct height relative to the kerb, that stormwater drains away from the road properly, and that the width falls within the approved dimensions.
The inspection also confirms the concrete thickness and finish meet council requirements, which is why driveway thickness should be considered before work starts rather than left until the crossover is ready to be checked.

Council’s Preferred Crossover Layout and Design Standards
The City of Greater Geelong has specific requirements around crossover width, setbacks from side boundaries, and the angle at which the crossover meets the road. These are not suggestions. A crossover that does not meet the preferred layout standards will not pass inspection.
Standard residential crossovers are typically between 3 and 6 metres wide, though this depends on your block and the road type. Your concreter should be familiar with these requirements before the job starts, not after.
Who Is Responsible for the Crossover
Once a crossover is constructed and approved, the property owner becomes responsible for its maintenance. If the crossover deteriorates and creates a hazard, council can require the owner to repair it.
This is worth understanding before you cut corners on materials or construction quality. A crossover built to the right standard from the start will hold up far longer and avoid future repair costs.
What Happens If You Build Without a Permit
Council has the authority to require unpermitted crossovers to be removed and the kerb and nature strip reinstated. That means paying for the original work and then paying again to have it undone and redone correctly.
Beyond the cost, an unpermitted crossover can also create issues when you sell the property. Conveyancers and buyers do check these things, and an unapproved structure on council land is a complication you do not want at settlement.
How to Get the Process Right

The permit application goes through the City of Greater Geelong before construction begins. Your concreter can advise on the dimensions and design, but the permit application is the homeowner’s responsibility unless your contractor handles it on your behalf.
Once the permit is approved, work can proceed. The post-construction inspection is then booked through council. A concreter experienced with local requirements will know what the inspector looks for and build accordingly.
For concreting in Belmont and surrounding Geelong suburbs, the same permit process applies. The rules are consistent across the municipality.
Ready to Get Your Crossover Done Properly?
If you are planning a new crossover or replacing an old one, the permit process is manageable when you know what to expect. Our team works on residential crossovers across Geelong and understands what council requires at every stage.
Call us on (03) 5292 1455 and we will walk you through what is involved for your specific property.



